Project: DaveBellairs   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Dave Bellairs   -  
Project:   Vans - RV-7   -   VIEW REPORTS
Total Hours:1467.9
Total Flight Time:
Start/Last Date:Jun 24, 2017 - No Finish Date
Engine:Lycoming IO-360
Propeller:Whirlwind 200RV
Panel:Advanced Flight Systems Avionics
 
Friendly URL: https://eaabuilderslog.org?s=DaveBellairs

Home or Last Project Picture

Aug 26, 2021     Cowling heat shield, inlet diffuser paint prep - (4 hours)       Category: Engine
Installed remaining lower cowling heat shield. Split it into several sections to avoid as many wrinkles as possible. Used the wallpaper seam roller to “iron” out as much as I could, but no way to avoid all the wrinkles in the heat shield foil. Filled some voids on the outside of the inlet diffusers to prepare for paint. Reinstalled camlocks on lower cowl.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.